Right Hand Side Stabilizer Rib Construction
Photo journal of the right hand side stabilizer ribs construction.
- November 21, 2005 -- Tail wood has arrived, unpacked
- December 15, 2005 -- Old camera, meet new camera
- December 17, 2005 -- New worktable for new plane parts
- December 19, 2005 -- Started horizontal stabilizer ribs, finally ordered aircraft-grade plywood
- December 23, 2005 -- Plywood arrived yesterday, first 3 ribs glued
- December 27, 2005 -- Things never go as planned the first time
- January 14, 2006 -- First ribs good, second set, same jig
- January 15, 2006 -- Covering first ribs
- January 19, 2006 -- New toys
- January 21, 2006 -- Follow the nylon road
- January 22, 2006 -- Hand punishment
- January 24, 2006 -- Starting horizontal stablilizer ribs 3, 4, 5 and 6
- February 8, 2006 -- Strokes and trimming
- February 10, 2006 -- Building ribs 3, 4, 5 and 6
- February 11, 2006 -- Ribs and strips glued, frame #10 covered
- February 26, 2006 -- Rib trimming, over half of stabilizer ribs done
- March 12, 2006 -- Stabilizer/Elevator rib quality control
- March 17, 2006 -- Drafting elevator nose ribs
- March 18, 2006 -- Stabilizer/Elevator rib wall art, all nose ribs done
- October 21, 2006 -- Fin and stabilizer tip bow molds
- October 22, 2006 -- Pre-bending tip bows strips
- October 28, 2006 -- Laminating tip bows, glue test
- November 4, 2006 -- Failed glue test!?
- October 13, 2007 -- Trailing edge shaping
- Octaber 15, 2007 -- Leading edge jig
- November 5, 2007 -- Leading edge jig, part 2
- November 14, 2007 -- Stab leading edges shaped
|