Left Hand Side Stabilizer Rib Construction
Photo journal of the left hand side stabilizer ribs construction.
- January 21, 2006 -- Follow the nylon road
- February 25, 2006 -- Second set of stab ribs 3, 4, 5, 6, frame #9 gussets glued
- March 4, 2006 -- Last stabilizer ribs covered and trimmed
- March 12, 2006 -- Stabilizer/Elevator rib quality control
- March 17, 2006 -- Drafting elevator nose ribs
- March 18, 2006 -- Stabilizer/Elevator rib wall art, all nose ribs done
- October 13, 2007 -- Trailing edge shaping
- Octaber 15, 2007 -- Leading edge jig
- November 5, 2007 -- Leading edge jig, part 2
- November 14, 2007 -- Stab leading edges shaped
|
Tail Parts Menu
|
Home